VARTSIKHE HPP

BASIC DATA FOR HPP CONSTRUCTION PROJECT (PROVISIONS FOR TECHNICAL ASSISTANCE SERVICES)

VARTSIKHE HPP I, II, III, IV:

On the RIONI RIV.

CUSTOMER: Sakmtavarenergo
GEN. DESIGNER: Hydroproject (Tbilisi)
GEN. CONTRACTOR: Sakhydroenergomsheni
TECHNICAL ASSISTANCE / SERVICES
of GEN. CONTRACTOR:
Orgenergomsheni

PARAMETERS:
Capacity, MW 4x4   184
Power output, GWh 4x262.5   1050
Reservoir storage, mln m3 2/14.6
Rated water discharge, m3/s 350
Discharge through waterways, m3/s 2950
Rated head, m 15
TYPE OF REGULATION: Seasonal
MAIN STRUCTURES:
Head hydropower system incorporating low crest spillway dam designed for water discharge of 2950 m3/s earth dam and water intakes that ensures water flow of 350 m3/s, sedimentation and diversion channel, with a total length 2700 m. Power house of the HPP I, II, III, IV including abutments and piers, are similar and disposed on the channel.
SCOPE OF WORKS:
Excavation, ths m3 16577
Embankment, filling, outlining, drainages and filters, ths m3 7047
Concrete and reinforced concrete, ths m3 785
Installation of structural metal elements and mechanisms, ths t 25
YEAR OF START UP: 1976-1988
DURATION OF THE CONSTRUCTION, month 140

Head hydropower system structures of VARTSIKHE HPP
1. spillway dam;
2. sluice galleries;
3. sedimental basin
4. water intake;
5. earth-fill dam;
6. tailrace canal

TRAILRACE CANAL OF VARTSIKHE HPP-s

PARAMETERS:
Lenght, m 27134
Including:
Lining sections, m 6050
Width at bottom, m 25
Width at top, m 60/65
Depth, m 6
Hillsides 1:2/1:2.5
Water discharge, m3/s 350
GEOLOGICAL CONDITIONS:
Delluvial loams in places with rare jackdaw and gravel, alluvial pebbles in places with rare small boulders
SCOPE OF WORKS:
Excavation, ths m3 16600
Filling, ths m3 6700
Gravel-sand grouting, ths m3 259
Filter material, ths m3 59
Concrete and reinforced concrete, ths m3 79

Tailrace Canal Plan of VARTSIKHE HPP-s
1. HPP-I;
2. HPP-II;
3. HPP-III;
4. HPP-IV;
5. head structures;
6. reservoir


Section on the axis of the HPP-I, II, III, IV power units



Section on the spillway of the HPP-I, II, III, IV

Vartsikhe HPP cascade โ€“ Technical assistance component services of construction HPP โ€“ I , II, III, IV

โ„– Buildings Designation of construction and mounting works S e r v i c e s Work execution period, years
Works organization projects Works execution projects Areas construction bases and temporary communications projects Supervision for implementation of given projects Consulting of technical and industrial issues
1 2 3 4 5 6 7 8 9
1 Concrete spillway Dam of headwork on the Rioni rv. Construction of the concrete dam, spillway shaft and flutbet + + + + + 1976รท1988
2 Combine with spillway Dam- rock filled Dam Filling of the dam + + + + +
3 Water intake and Sedimental basin of the diversion channel Construction works + + + + +
4 Diversion tailrace channel Working of the channel soils with arrangement a qualitative embankment proper sections + + + + +
5 HPP-I, II, III, IV disposed on the tailrace channel Construction of the abutments and piers + + + + +