VARTSIKHE HPP I, II, III, IV: |
On the RIONI RIV. |
CUSTOMER: | Sakmtavarenergo |
GEN. DESIGNER: | Hydroproject (Tbilisi) |
GEN. CONTRACTOR: | Sakhydroenergomsheni |
TECHNICAL ASSISTANCE / SERVICES of GEN. CONTRACTOR: |
Orgenergomsheni |
PARAMETERS: | |
Capacity, MW | 4x4 184 |
Power output, GWh | 4x262.5 1050 |
Reservoir storage, mln m3 | 2/14.6 |
Rated water discharge, m3/s | 350 |
Discharge through waterways, m3/s | 2950 |
Rated head, m | 15 |
TYPE OF REGULATION: | Seasonal |
MAIN STRUCTURES: | |
Head hydropower system incorporating low crest spillway dam designed for water discharge of 2950 m3/s earth dam and water intakes that ensures water flow of 350 m3/s, sedimentation and diversion channel, with a total length 2700 m. Power house of the HPP I, II, III, IV including abutments and piers, are similar and disposed on the channel. | |
SCOPE OF WORKS: | |
Excavation, ths m3 | 16577 |
Embankment, filling, outlining, drainages and filters, ths m3 | 7047 |
Concrete and reinforced concrete, ths m3 | 785 |
Installation of structural metal elements and mechanisms, ths t | 25 |
YEAR OF START UP: | 1976-1988 |
DURATION OF THE CONSTRUCTION, month | 140 |
PARAMETERS: | |
Lenght, m | 27134 |
Including: | |
Lining sections, m | 6050 |
Width at bottom, m | 25 |
Width at top, m | 60/65 |
Depth, m | 6 |
Hillsides | 1:2/1:2.5 |
Water discharge, m3/s | 350 |
GEOLOGICAL CONDITIONS: | |
Delluvial loams in places with rare jackdaw and gravel, alluvial pebbles in places with rare small boulders | |
SCOPE OF WORKS: | |
Excavation, ths m3 | 16600 |
Filling, ths m3 | 6700 |
Gravel-sand grouting, ths m3 | 259 |
Filter material, ths m3 | 59 |
Concrete and reinforced concrete, ths m3 | 79 |
โ | Buildings | Designation of construction and mounting works | S e r v i c e s | Work execution period, years | ||||
---|---|---|---|---|---|---|---|---|
Works organization projects | Works execution projects | Areas construction bases and temporary communications projects | Supervision for implementation of given projects | Consulting of technical and industrial issues | ||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
1 | Concrete spillway Dam of headwork on the Rioni rv. | Construction of the concrete dam, spillway shaft and flutbet | + | + | + | + | + | 1976รท1988 |
2 | Combine with spillway Dam- rock filled Dam | Filling of the dam | + | + | + | + | + | |
3 | Water intake and Sedimental basin of the diversion channel | Construction works | + | + | + | + | + | |
4 | Diversion tailrace channel | Working of the channel soils with arrangement a qualitative embankment proper sections | + | + | + | + | + | |
5 | HPP-I, II, III, IV disposed on the tailrace channel | Construction of the abutments and piers | + | + | + | + | + |